Dumsor: Ghana To Experience Power Crisis As Atuabo Gas Undergo 14-days Shutdown From Monday

Spread the love

The Ghana National Gas Company (GNGC) has announced a planned maintenance shutdown of its processing plant at Atuabo in the Western Region.

According to the Company, the shutdown is to allow engineers to undertake routine maintenance on the facility to help improve its capacity of continuous productivity as well as prolong its lifespan.

A statement issued by the Company on Friday, October 1 noted that the shutdown was to have taken 48 days but key stakeholders including Tullow Oil, ENI, Volta River Authority (VRA) and MLE have put in place measures to have it last 14 days.

THIS IS TRENDING:   Over 430,000 Farmers Affected by Northern Ghana Drought, GH₵3.5 Billion Lost - Bryan Acheampong

“During the maintenance shutdown, there shall be an installation of High Integrity Pressure Protection System (HIPPS) and maintenance works on the replacement of Small Bore Piping (SBP), Heat Exchangers (HEX) cleaning, replacement of damaged Product Cooler, replacement of defective valves and re-calibration of all our Safety Critical Equipment including Pressure Safety Valves (PSVs).”

It added that “The key benefit of this shutdown is to enhance operability and reliability of our processing and transportation infrastructure.”

“The Board, Management and Maintenance team of Ghana Gas wishes to assure all its stakeholders that we will be working with our partners to ensure system stability during the shutdown period and minimise the impact on power supply.”

We Will Love You To Join Our Over 160k Members Instagram Family With Just One Click @gharticles

Source: GhArticles.com

THIS IS TRENDING:   NOBISCO bursar arrested for allegedly diverting food supplies meant for students

 

About Media President

Check Also

Ten Killed in Fatal Crash on Accra–Kumasi Highway

Spread the love Ten people have been confirmed dead following a fatal crash on the …